Countertops · Lee County, Florida

Countertops for kitchens and bathrooms

New countertops can transform a kitchen or bathroom without a full remodel. We help you choose the material, coordinate measuring and fabrication, and take care of the tear-out and installation, with sinks and faucets reconnected by a licensed plumber.

  • Kitchen countertops and vanity tops
  • Quartz, granite, solid surface and more
  • Old tops removed, sinks reconnected
  • License #CGC 1531839

Free estimate

What are you planning?
When would you like to start?
Where is the home?

Prefer to talk? (239) 555-0100

What we do

Countertop services

Kitchen countertops

Replacing worn or dated counters on existing cabinets, or new tops as part of a larger kitchen remodel.

Bathroom vanity tops

Single and double vanity tops with undermount or vessel sinks, sized to the cabinet and the room.

Measuring & fabrication

Tops are templated once the cabinets are set, then cut to fit, including sink and cooktop cutouts and the edge profile you choose.

Tear-out & reconnection

Old tops removed with care for the cabinets below, and sinks and faucets reconnected by a licensed plumber.

Compare

Comparing countertop materials

Each material has strengths. Here is how the most common choices generally compare.

QuartzGraniteSolid surfaceLaminate
Made ofEngineered stone: crushed quartz bound with resinNatural stoneSolid acrylic or polyester materialA printed layer over a particleboard core
UpkeepNo sealing neededPeriodic sealing is usually recommendedNo sealing; light scratches can be buffed outNo sealing; chips and swelling are hard to repair
HeatUse trivets; the resin can scorchHandles heat wellUse trivetsUse trivets
LookConsistent color and patternEvery slab is uniqueSmooth, nearly seamlessMany printed styles
Undermount sinkYesYesYes, or an integrated sinkUsually not

General guidance only. Products vary by brand and grade, and we’ll go through samples and options during your estimate.

Local know-how

What to know before new countertops

01 — Cabinets

A solid, level base

Stone tops are heavy and unforgiving. Cabinets need to be sound and level before measuring, so we check them during the estimate.

02 — Timing

Measure after cabinets are set

Final measurements are taken once the cabinets are in place, and fabrication takes time after that. The schedule accounts for both.

03 — Sun

Bright rooms and lanais

Strong direct sunlight can discolor some quartz products, which is why manufacturers generally advise against them outdoors. We’ll suggest materials that suit the space.

Our process

How your countertops project works

1

Choose the material

We look at your cabinets and help you compare materials, colors and edge profiles.

2

Template

Precise measurements of the cabinets, sink and appliances are taken for fabrication.

3

Install

Old tops removed, new tops set, and sinks and faucets reconnected by a licensed plumber.

4

Walkthrough

We review the finished tops and seams with you and leave the space clean.

Questions

Common questions about countertops

Have a different question? Ask when you request your estimate, or give us a call.

Can new countertops go on my existing cabinets?

Often, yes, if the cabinets are solid, level and in a layout you want to keep. We’ll check them during the estimate and tell you honestly if anything needs attention first.

How long will I be without a sink?

Usually only between removing the old tops and installing the new ones. It depends on the material and the fabrication schedule; your written estimate includes the expected timeline.

Do I need a new sink and faucet?

Not always. New stone tops are a natural time to switch to an undermount sink or a new faucet, but existing ones can often be reused. We’ll go through the options.

Will my countertops have seams?

Long runs and L-shaped counters usually need at least one seam. A good layout puts seams where they’re least noticeable, and we’ll talk through where they’ll fall before fabrication.

Ready to plan your project?

Tell us what you have in mind. We will schedule a time to see the space and prepare a free, written estimate.

Not sure where to start? Try the 60-second project planner